Nextage Group 1300 075 075

External works as a program, not random jobbing.

Line marking, pedestrian safety treatments, access and related car park packages, scoped and staged like every other Nextage pack.

Car park and external works covers line marking, pedestrian safety treatments, access and related external packages across a retail estate. Nextage scopes and stages this work the same way as its other programs, to one standard, priced per site and delivered nationally, rather than as one off jobbing per store.

The problem

  • External works get handed to whoever is nearby, so the result differs at every store.
  • Pedestrian routes and vehicle movements are treated as a maintenance afterthought.
  • There is no per site number, so it never makes it into a capital submission.

What's included

  • Line marking to a set standard
  • Pedestrian safety treatments and route definition
  • Access and vehicle movement treatments
  • Related car park and external packages scoped per site
  • Completion report per site

Public liability insurance: $20 million.

Program shape

How the work runs

Same order every time. The order is what makes site 40 match site 1.

  1. Scope the site

    What is there, what moves through it, and what is actually failing.

  2. Set the standard

    The same treatment across the estate, written down.

  3. Price per site

    So it can be staged like any other pack.

  4. Deliver

    Multistate, under one accountable team.

  5. Report

    Photo completion pack.

A good fit

  • Retail car parks needing the same treatment repeated across sites
  • Safety led external work that has to be consistent to be defensible
  • External packages bundled with a ramp, bollard or screen program

Not a fit

  • Civil mega projects
  • Full car park structural reconstruction
  • Ongoing grounds maintenance

Photos

Line marking, wheel stops and a crossing

Yellow bay lines and hatching with rubber wheel stops, and a pedestrian crossing with speed humps and signs at a car park entry.

Line marking and pedestrian route
Car park entry context

FAQ

About car park & external works

Is this civil construction?

No. This is practical, safety led external work across a retail estate: line marking, pedestrian treatments, access. Civil mega projects are not what we do.

Can external works be bundled with another program?

Yes, and it usually should be. If a crew is already attending for a ramp or bollard install, the external scope should be on the same visit.

Start with one site.

We'll measure, price it, and show you the pack.

Call 1300 075 075 Start with one site